| | The application of inserts in a Carbon Dial Table is outlined by the steps provided in the photographs. | | |
| | | | | | | | |
| STEP 1: Aluminum knurled inserts as provided from manufacturer. Insert body contaminated from oil and handling. | | STEP 2: Inserts cleaned with Acetone | |
| | | | | | | | |
| STEP 3: Clean Inserts | | | | | STEP 4: Dial Table surface treated with mold cleaner. |
| | | | | | | | |
| STEP 5: Epoxy Adhesive applied to surface of insert | | STEP 6: Inserts potted in Carbon Dial table samples. Wait 24 hours before machining | |
| | | | | | | | | |